QM2Remastered: Bringing It Together
Source: Our analysis of the creator's lived experience, based on what they said in this video.
Creator's Key Takeaways
We're now roughly halfway through the remastering of Queen Mary 2, and the ship is slowly starting to take shape.
A lot of the main construction work is now taking place. So, now a new wave of trades and craftsmen are on board.
This is where the real attention to detail is so crucial.
We're now starting to see small glimpses of how the remastered Queen Mary 2 will look when she arrives back in Southampton on June the 23rd.
Topics Covered
Scale: 0–5 strips in half-step increments. 0 = “meh”, 5 = “bacon bliss”. Aggregated from creator-review sentiment, weighted by channel expertise.
About our Bacon Score methodologyYouTube Video Description↓
Much of the heavy construction work is now complete, and attention shifts to the finer details. Craftsmen are now on board installing new fittings and repairing existing items. Artwork is being restored, floors re-varnished and tiles laid.