Europalink and Viking Grace arrives in Turku 28.3.2022 | Finnlines & Viking Line
YouTube Video Description↓
Europalink and Viking Grace arrives and passe Turku archipelago 28.3.2022. M/S Europalink was originally planned to be called MS Finnlady, but delays in construction made Finnlines swap the names of the two ships. She was built at the Castellammare di Stabia shipyard, and her original delivery date was planned to be in mid-2006, but eventually she was delivered in March 2007 and used on Finnlines Nordö-Link service between Malmö and Travemünde. In January 2022, Europalink was transferred to Naantali-Långnäs-Kapellskär route and reflagged under Finnish flag. The Europalink is registered in Mariehamn, Finland. Viking Grace is a cruiseferry constructed at STX Europe Turku Shipyard, Finland for the Finland-based ferry company Viking Line. The ship was delivered to her owners on 10 January 2013, and entered service on 13 January 2013. #Europalink #VikingGrace #VikingLine This video is NOT sponsored. Some product links are affiliate links which means if you buy something we'll receive a small commission. ============================= Gear I use when I make videos: ============================= Camera 1: https://amzn.to/3H0oLKy (Amazon Link) Phone Camera: https://amzn.to/44JzCCx (Amazon Link) Camera stand: https://amzn.to/4mswxxe (Amazon Link) Computer: https://amzn.to/4moaveV (Amazon Link)