Trip Bacon — The secret ingredient to the perfect getaway logo
Trip Bacon

Icon of the Seas: Full Power Recovery Test (4k)

Derek Picone
Derek Picone
👁️ 651 views📅 1 years ago⏱️ 5:55
YouTube Video Description

On May 4th the Icon of the Seas set sail on a 7 night Eastern Caribbean and Perfect Day in CocoCay sailing. Sailing round trip from Miami she made stops in St. Maarten and St. Thomas as well as the addition of CocoCay in the Bahamas. On May 10th the shortly after the Icon of the Seas docked in CocoCay Bahamas the crew onboard began preparing to shut various systems and services down such as the water slides and flow rider. This was in preparation for a scheduled full power recovery test that ships are required to conduct. At 10am the announcement was made that the test was about to be commencing which meant that all power was to be shut off, which includes services such as the elevators and lighting onboard. As soon as it began the chill island (deck 15-17 pool deck) area was overtaken by a loud sound, potentially a pressure release from the LNG (liquid natural gas) system that requires power at all times to keep the volatile fuel in a liquid state. The funnels then each released a large black exhaust plume, the only time all voyage anything beyond a light white wisp was visible from the funnels. Even after the test was completed and power onboard returned to normal the sound on the pool deck remained for an additional 5 minutes before stopping. This video was filmed on 5/10/2024 when the Icon of the Seas made a visit to CocoCay in the Bahamas. 7 Night May 4th, 2024 Eastern Caribbean and Perfect Day Sailing Itinerary: Day 1: Miami, FL (5/4/24 Departing 5:00 PM) Day 2: Day at Sea (5/5/24) Day 3: Day at Sea (5/6/24) Day 4: Philipsburg, St. Maarten (5/7/24 from 8:00 AM to 6:00 PM) Day 5: Charlotte Amalie, St. Thomas (5/8/24 from 7:00 AM to 3:00 PM) Day 6: Day at Sea (5/9/24) Day 7: Perfect Day CocoCay, Bahamas (5/10/24 from 9:00 AM to 5:00 PM) Day 8: Miami, FL (5/11/24 Arriving 2:30 AM) Content: 0:00:00 5 Minute Warning Power Outage Explanation 0:00:25 Pre Test Power Outage Warning 0:01:08 Full Power Recovery Test Being Conducted 0:05:16 Full Power Recovery Test Completion Message 0:05:34 Next Videos